Built Different

Episode 91: Mind the Gap: Onsite vs. Offsite Interface Risk

3:53

On any DfMA project — modular, mass timber, or panelized — two construction operations run in parallel: one in a factory built to millimeter tolerances, one in the field built to the looser realities of poured concrete and human hands. Today's episode breaks down why the interface between those two scopes is the defining execution risk in industrialized construction, and what developers, GCs,…